With our kitset shelter design nearing completion and final hand-in only a week away, it was time to do a final tally of our costs. Taking into account that with two less tetrahedrons there is 1.1m less builder’s paper, and that we managed to find stronger cord that was 0.90c per metre (instead of $2 a metre), our final costs came in at $89.62 – a whole $10.38 under budget! WhooHoo!!!!!